United States β€Ί Grid β€Ί Interconnection queues β€Ί North Carolina

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in North Carolina (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5101 MW
Active in queue504 MW6 requests
Agreement signed229 MW5 requests
Withdrawn467,039 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project 64646, Richmond County
Gas Β· Duke Energy Progress, LLC
22.0 MWOperating Richmond, NCSoutheast Jan 20202022
Gas project 64750, Richmond County
Gas Β· Duke Energy Progress, LLC
21.0 MWOperating Richmond, NCSoutheast Jan 20202023
Gas project 64758, Richmond County
Gas Β· Duke Energy Progress, LLC
20.0 MWOperating Richmond, NCSoutheast Jan 20202023
Gas project 64734, Richmond County
Gas Β· Duke Energy Progress, LLC
20.0 MWOperating Richmond, NCSoutheast Jan 20202023
Gas project 63790, Richmond County
Gas Β· Duke Energy Progress, LLC
18.0 MWOperating Richmond, NCSoutheast Jan 20202022

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)