Requests shown385.0 MW
Active in queue737 MW7 requests
Agreement signed564 MW4 requests
Withdrawn214,415 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
American Beech Solar
Solar
60.0 MWOperating Halifax, NCPJM Mar 20172025
Nuclear project 24751, Wake County
Nuclear Β· Duke Energy Progress, LLC
14.0 MWOperating Wake, NCSoutheast May 20172019
Battery storage project 18124, Onslow County
Battery storage Β· Duke Energy Progress, LLC
11.0 MWOperating Onslow, NCSoutheast Oct 20172023

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)