United States β€Ί Grid β€Ί Interconnection queues β€Ί North Carolina

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in North Carolina (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2229 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn1131 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Timbermill Wind Farm
Onshore wind
189 MWOperating Perquimans, NCPJM Jul 20132024
Solar project 4894, Wilson County
Solar Β· Duke Energy Progress, LLC
40.0 MWOperating Wilson, NCSoutheast Sep 20132016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)