United States β€Ί Grid β€Ί Interconnection queues β€Ί North Carolina

OCTARY USA Β· INTERCONNECTION QUEUES

Queue projects under construction in North Carolina (2022 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4162 MW
Active in queue860 MW12 requests
Agreement signed376 MW5 requests
Withdrawn444,825 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 569632, Scotland County
Solar
80.0 MWUnder construction Scotland, NCSoutheast Jun 2022target 2026
Solar project 955167, Johnston County
Solar
73.0 MWUnder construction Johnston, NCSoutheast Jun 2022target 2026
Hydro project 570430, Montgomery County
Hydro Β· Duke Energy Progress, LLC
6.3 MWUnder construction Montgomery, NCSoutheast Jun 2022target 2025
Battery storage project 563202, Burke County
Battery storage
2.7 MWUnder construction Burke, NCSoutheast Jun 2022target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)