Projects with signed interconnection agreements in North Carolina (2023 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown12999 MW
Active in queue2,105 MW26 requests
Agreement signed999 MW12 requests
Withdrawn543,841 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

12 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project 897163, Wayne County
Battery storage Β· Duke Energy Progress, LLC - HF Lee Energy - Storage
260 MWAgreement signed Wayne, NCSoutheast Jun 2023
Battery storage project 898999, Robeson County
Battery storage Β· Masked
200 MWAgreement signed Robeson, NCSoutheast Jun 2023
Gas project 899759, Catawba County
Gas
136 MWAgreement signed Catawba, NCSoutheast Jun 2023target 2028
Battery storage project 899053, Wilkes County
Battery storage
120 MWAgreement signed Wilkes, NCSoutheast Jun 2023
Solar project 917443, Scotland County
Solar
80.0 MWAgreement signed Scotland, NCSoutheast Sep 2023
Solar project 920659, Wayne County
Solar
67.0 MWAgreement signed Wayne, NCSoutheast Sep 2023
Gas project 899591, Richmond County
Gas Β· Duke Energy Progress, LLC
46.8 MWAgreement signed Richmond, NCSoutheast Jun 2023
Solar project 919551, Lincoln County
Solar
40.0 MWAgreement signed Lincoln, NCSoutheast Sep 2023
Gas project 904269, Wayne County
Gas Β· Duke Energy Progress, LLC
26.0 MWAgreement signed Wayne, NCSoutheast Jun 2023
Gas project 899581, Wayne County
Gas Β· Duke Energy Progress, LLC
20.0 MWAgreement signed Wayne, NCSoutheast Jun 2023
Hydro project 899609, Jackson County
Hydro
1.8 MWAgreement signed Jackson, NCSoutheast Jun 2023target 2026
Hydro project 899793, Jackson County
Hydro
1.5 MWAgreement signed Jackson, NCSoutheast Jun 2023target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)