United States β€Ί Grid β€Ί Interconnection queues β€Ί New Mexico

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in New Mexico (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown73,935 MW
Active in queue5,131 MW15 requests
Agreement signed1,196 MW8 requests
Withdrawn243,768 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project Q320, San Juan County
Onshore wind
1,500 MWPaused / redesign San Juan, NMWest Sep 2019target 2026
Onshore wind project Q318, San Juan County
Onshore wind
1,000 MWPaused / redesign San Juan, NMWest Sep 2019target 2026
Onshore wind project Q319, San Juan County
Onshore wind
1,000 MWPaused / redesign San Juan, NMWest Sep 2019target 2026
LA130S Project
Solar + storage
130 MWIn study Luna, NMWest Mar 2019target 2026
Solar + storage project IA-PNM-2019-08, Mckinley County
Solar + storage Β· RWE Solar Dev
125 MWPaused / redesign Mckinley, NMWest Apr 2019target 2022
Battery storage project IA-PNM-2019-18, Bernalillo County
Battery storage
100 MWPaused / redesign Bernalillo, NMWest Apr 2019target 2022
Onshore wind project IA-PNM-2019-12, Torrance County
Onshore wind
80.0 MWIn study Torrance, NMWest Apr 2019target 2020

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)