United States β€Ί Grid β€Ί Interconnection queues β€Ί New Jersey

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in New Jersey (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown313.1 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn33189 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Taylors Lane Solar
Solar
10.0 MWOperating Burlington, NJPJM Dec 20172019
Berkshire Solar
Solar
1.6 MWOperating Morris, NJPJM Mar 20172021
Bergen 13kV
Solar
1.5 MWOperating Bergen, NJPJM Aug 20172019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)