Completed queue projects in Nebraska (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6761 MW
Active in queue1,833 MW8 requests
Agreement signed1,245 MW5 requests
Withdrawn232,991 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project GEN-2020-025, Sarpy County
Gas
255 MWOperating Sarpy, NESPP Apr 20202025
Gas project GEN-2020-028, Sarpy County
Gas
255 MWOperating Sarpy, NESPP Apr 20202025
Solar project GEN-2020-002, Saunders County
Solar
81.0 MWOperating Saunders, NESPP Apr 20202024
Gas project GEN-2020-043, Douglas County
Gas
56.5 MWOperating Douglas, NESPP Apr 20202025
Gas project GEN-2020-044, Douglas County
Gas
56.5 MWOperating Douglas, NESPP Apr 20202025
Gas project GEN-2020-045, Douglas County
Gas
56.5 MWOperating Douglas, NESPP Apr 20202025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)