United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Montana (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown41,295 MW
Active in queue1,295 MW4 requests
Agreement signed0.0 MW0 requests
Withdrawn64857 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project 310, Meagher County
Battery storage
450 MWPaused / redesign Meagher, MTWest Dec 2016target 2023
Battery storage project C002, Meagher County
Battery storage
450 MWPaused / redesign Meagher, MTWest Dec 2016target 2020
Wind + storage project 300, Stillwater County
Wind + storage
315 MWIn study Stillwater, MTWest Jul 2016target 2020
Solar + storage project 309, Yellowstone County
Solar + storage
80.0 MWIn study Yellowstone, MTWest Dec 2016target 2022

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)