United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Montana (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown425.9 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn15442 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project 153, Teton County
Onshore wind
15.0 MWOperating Teton, MTWest Aug 20122012
Onshore wind project 152, Wheatland County
Onshore wind
9.7 MWOperating Wheatland, MTWest Aug 20122013
Whitefish In-Line Hydroelectric Project
Hydro
1.0 MWOperating Flathead, MTWest Jan 2012target 2012
Onshore wind project GI-1215, Phillips County
Onshore wind Β· MT DEQ (Landusky)
0.2 MWOperating Phillips, MTWest Oct 2012target 2012

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)