United States β€Ί Grid β€Ί Interconnection queues β€Ί Mississippi

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Mississippi (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5193 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn5193 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project IC-408, Forrest County
Solar
49.4 MWWithdrawn / abandoned Forrest, MSSoutheast Jan 2015
Solar project IC-404, Lauderdale County
Solar
49.4 MWWithdrawn / abandoned Lauderdale, MSSoutheast Jan 2015
Other project 265, Lauderdale County
Other
40.0 MWWithdrawn / abandoned Lauderdale, MSSoutheast Feb 2015
Other project 264, Lauderdale County
Other
40.0 MWWithdrawn / abandoned Lauderdale, MSSoutheast Jan 2015
Solar project 275, Winston County
Solar
14.0 MWWithdrawn / abandoned Winston, MSSoutheast Nov 2015

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)