United States β€Ί Grid β€Ί Interconnection queues β€Ί Mississippi

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Mississippi (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5433 MW
Active in queue512 MW5 requests
Agreement signed212 MW3 requests
Withdrawn8882 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project 317, Desoto County
Gas
115 MWOperating Desoto, MSSoutheast Jun 2017target 2018
Gas project 312, Benton County
Gas
115 MWOperating Benton, MSSoutheast Mar 2017
Solar project J830, Madison County
Solar
100 MWOperating Madison, MSMISO Jun 20172021
Gas project 310, Lowndes County
Gas
78.0 MWOperating Lowndes, MSSoutheast Mar 2017
Gas project J888, George County
Gas
25.0 MWOperating George, MSMISO Jun 20172019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)