United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Minnesota (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5832 MW
Active in queue832 MW5 requests
Agreement signed0.0 MW0 requests
Withdrawn172,300 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project J1898, Olmsted County
Battery storage
200 MWIn study Olmsted, MNMISO Aug 2021target 2024
Solar + storage project J1846, Renville County
Solar + storage
200 MWIn study Renville, MNMISO Jul 2021target 2024
Solar + storage project J2219, Olmsted County
Solar + storage
180 MWIn study Olmsted, MNMISO Jul 2021target 2028
Onshore wind project J2053, Redwood County
Onshore wind
152 MWIn study Redwood, MNMISO Aug 2021target 2025
Solar project J2309, Murray County
Solar
100 MWIn study Murray, MNMISO Sep 2021target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)