Interconnection queue in Michigan (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown28.0 MW
Active in queue8.0 MW2 requests
Agreement signed6.4 MW1 requests
Withdrawn151,811 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project J571, Kalamazoo County
Gas
6.4 MWAgreement signed Kalamazoo, MIMISO May 2016target 2018
Other project J646, Macomb County
Other
1.6 MWUnder construction Macomb, MIMISO Jun 2016target 2010

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)