πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in Michigan (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3400 MW
Active in queue2,565 MW16 requests
Agreement signed2,065 MW12 requests
Withdrawn344,217 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Cass County Solar
Solar + storage Β· Steelhead Solar, LLC
200 MWIn study Cass, MIPJM Mar 2020target 2023
Battery storage project J1845, Calhoun County
Battery storage
100 MWIn study Calhoun, MIMISO Dec 2020target 2025
Battery storage project J1844, Washtenaw County
Battery storage
100 MWIn study Washtenaw, MIMISO Dec 2020target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)