United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Michigan (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown71,743 MW
Active in queue564 MW4 requests
Agreement signed100 MW1 requests
Withdrawn245,303 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project J793, St. Clair County
Gas
1,175 MWOperating St. Clair, MIMISO Jun 20172021
Solar project J796, Shiawassee County
Solar
239 MWOperating Shiawassee, MIMISO Jun 20172020
Solar project J806, Calhoun County
Solar
149 MWOperating Calhoun, MIMISO Jun 20172021
Onshore wind project J928, Delta County
Onshore wind
80.0 MWOperating Delta, MIMISO Jun 20172019
Onshore wind project J701, Tuscola County
Onshore wind
49.0 MWOperating Tuscola, MIMISO Jun 20172018
DC Cook Generating Plant Unit No. 2
Nuclear
38.0 MWOperating Berrien, MIPJM Mar 20172017
Onshore wind project J794, Gratiot County
Onshore wind
12.5 MWOperating Gratiot, MIMISO Jun 20172018

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)