United States βΊ Grid βΊ Interconnection queues βΊ Maryland
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in Maryland (2020 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Costen Solar Solar |
8.8 MW | |
| Dickerson HCT1, HCT2, DCT1 Gas |
5.0 MW | |
| Fairhaven Battery Energy Storage System Battery storage |
2.5 MW | |
| Kumquat Solar Solar |
2.0 MW | |
| Other project AF2-152, Charles County Other |
2.0 MW | |
| Chalk Point CT 2 Gas |
2.0 MW | |
| Other project AF2-153, Charles County Other |
2.0 MW | |
| Chesapeake Beach BESS Battery storage |
1.0 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)