United States β€Ί Grid β€Ί Interconnection queues β€Ί Maryland

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Maryland (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown825.3 MW
Active in queue1,012 MW7 requests
Agreement signed1,012 MW7 requests
Withdrawn341,377 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Costen Solar
Solar
8.8 MWOperating Somerset, MDPJM Oct 20202024
Dickerson HCT1, HCT2, DCT1
Gas
5.0 MWOperating Montgomery, MDPJM Mar 20202023
Fairhaven Battery Energy Storage System
Battery storage
2.5 MWOperating Anne Arundel, MDPJM Jul 20202024
Kumquat Solar
Solar
2.0 MWOperating Wicomico, MDPJM Mar 20202022
Other project AF2-152, Charles County
Other
2.0 MWOperating Charles, MDPJM Mar 2020target 2021
Chalk Point CT 2
Gas
2.0 MWOperating Prince George's, MDPJM Mar 20202023
Other project AF2-153, Charles County
Other
2.0 MWOperating Charles, MDPJM Mar 2020target 2021
Chesapeake Beach BESS
Battery storage
1.0 MWOperating Calvert, MDPJM Nov 20202023

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)