πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Maine (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown475.4 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn4195 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Hancock Wind Project
Onshore wind
51.0 MWOperating Hancock, MEISO-NE Aug 2012target 2016
Weston Station AVR Replacement U2-4
Hydro
14.8 MWOperating Somerset, MEISO-NE Feb 2012target 2015
Westbrook Energy Center Expansion
Gas
9.5 MWOperating York, MEISO-NE Jan 2012target 2013
Pisgah Mountain Increase (see Q349)
Onshore wind
0.1 MWOperating Penobscot, MEISO-NE Dec 2012target 2016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)