United States β€Ί Grid β€Ί Interconnection queues β€Ί Louisiana

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Louisiana (2023 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6570 MW
Active in queue644 MW4 requests
Agreement signed325 MW1 requests
Withdrawn6570 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project GEN-2023-155, Caddo Parish County
Solar
200 MWWithdrawn / abandoned Caddo Parish, LASPP Oct 2023target 2028
Solar project J2770, Grant Parish County
Solar
125 MWWithdrawn / abandoned Grant Parish, LAMISO Sep 2023target 2026
Solar project GEN-2022-108, Desoto Parish County
Solar
100 MWWithdrawn / abandoned Desoto Parish, LASPP Jan 2023target 2027
Battery storage project GEN-2023-SR23, Caddo Parish County
Battery storage
73.5 MWWithdrawn / abandoned Caddo Parish, LASPP Jun 20232025
Gas project GEN-2022-185, Caddo Parish County
Gas
46.0 MWWithdrawn / abandoned Caddo Parish, LASPP Feb 20232024
Solar project GEN-2023-030, Desoto Parish County
Solar
25.0 MWWithdrawn / abandoned Desoto Parish, LASPP Oct 2023target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)