United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Kentucky (2023 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project 571, Hickman County Solar |
175 MW | Withdrawn / abandoned |
| Battery storage project LGE-GIS-2023-001, Mercer County Battery storage |
125 MW | Withdrawn / abandoned |
| Solar project 558, Caldwell County Solar |
125 MW | Withdrawn / abandoned |
| Solar + storage project LGE-GIS-2023-006, Daviess County Solar + storage |
125 MW | Withdrawn / abandoned |
| Solar project 534, Butler County Solar |
115 MW | Withdrawn / abandoned |
| Solar project LGE-GIS-2023-005, Caldwell County Solar |
100 MW | Withdrawn / abandoned |
| Solar + storage project LGE-GIS-2023-004, Mercer County Solar + storage |
89.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)