United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Illinois (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5891 MW
Active in queue5,100 MW37 requests
Agreement signed3,710 MW30 requests
Withdrawn434,420 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J1464, Macoupin County
Solar
593 MWOperating Macoupin, ILMISO Apr 20192024
Onshore wind project J1453, Mason County
Onshore wind
188 MWOperating Mason, ILMISO Apr 20192022
Onshore wind project J1454, Mason County
Onshore wind
58.5 MWOperating Mason, ILMISO Apr 20192021
High Point II Solar
Solar
50.0 MWOperating Stephenson, ILPJM Jan 20192023
Magid Glove & Safety Mfg. Co
Battery storage
1.0 MWOperating Will, ILPJM Feb 20192021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)