United States β€Ί Grid β€Ί Interconnection queues β€Ί Idaho

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Idaho (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4766 MW
Active in queue0.4 MW1 requests
Agreement signed0.4 MW1 requests
Withdrawn4766 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Other project 524, Elmore County
Other
750 MWWithdrawn / abandoned Elmore, IDWest Aug 2017
Solar project 55, Nez Perce County
Solar
12.5 MWWithdrawn / abandoned Nez Perce, IDWest May 2017target 2018
Hydro project 526, Ada County
Hydro
2.3 MWWithdrawn / abandoned Ada, IDWest Aug 2017
Solar project 879, Bonneville County
Solar
1.0 MWWithdrawn / abandoned Bonneville, IDWest May 2017target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)