OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Idaho (2011 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Onshore wind project 398-B, Bonneville County Onshore wind |
288 MW | Withdrawn / abandoned |
| Onshore wind project 398-A, Bonneville County Onshore wind |
192 MW | Withdrawn / abandoned |
| Solar project 388, Jerome County Solar |
60.0 MW | Withdrawn / abandoned |
| Onshore wind project 370, Bonneville County Onshore wind |
60.0 MW | Withdrawn / abandoned |
| Onshore wind project 371, Twin Falls County Onshore wind |
51.0 MW | Withdrawn / abandoned |
| Solar project 369, Elmore County Solar |
20.0 MW | Withdrawn / abandoned |
| Other project 379, Ada County Other |
4.3 MW | Withdrawn / abandoned |
| Other project 363, Ada County Other |
4.3 MW | Withdrawn / abandoned |
| Hydro project 368, Jerome County Hydro |
3.2 MW | Withdrawn / abandoned |
| Other project 383, Twin Falls County Other |
1.2 MW | Withdrawn / abandoned |
| Other project 372, Ada County Other |
1.1 MW | Withdrawn / abandoned |
| Hydro project 362, Lemhi County Hydro |
1.0 MW | Withdrawn / abandoned |
| Other project 364, Twin Falls County Other |
0.8 MW | Withdrawn / abandoned |
| Other project 365, Cassia County Other |
0.8 MW | Withdrawn / abandoned |
| Hydro project 366, Lemhi County Hydro |
0.5 MW | Withdrawn / abandoned |
| Solar project 381, Twin Falls County Solar |
0.4 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)