Completed queue projects in Idaho (2023 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown419.5 MW
Active in queue2,109 MW12 requests
Agreement signed200 MW2 requests
Withdrawn549,728 MW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Hydro project 739, Shoshone County
Hydro ยท Big Wood Canal Company
9.1 MWOperating Shoshone, IDWest Oct 2023target 2024
Gas project 702, Canyon County
Gas ยท City of Nampaโ€šร„รฎWastewater Division
4.8 MWOperating Canyon, IDWest Feb 20232023
Hydro project 712, Ada County
Hydro ยท Barber Pool Hydro, LLC
3.7 MWOperating Ada, IDWest May 2023target 2024
Hydro project 740, Twin Falls County
Hydro ยท Rock Creek Hydro LLC
1.9 MWOperating Twin Falls, IDWest Oct 2023target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)