Completed queue projects in Idaho (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown423.0 MW
Active in queue0.4 MW1 requests
Agreement signed0.4 MW1 requests
Withdrawn4766 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 523, Twin Falls County
Solar Β· Jackpot Holdings, LLC
20.0 MWOperating Twin Falls, IDWest May 20172022
Hydro project 522, Twin Falls County
Hydro Β· Shorock Hydro, LLC
2.5 MWOperating Twin Falls, IDWest May 2017target 2018
Hydro project 527, Twin Falls County
Hydro Β· CALM Enterprises, LLC
0.3 MWOperating Twin Falls, IDWest Aug 2017target 2018
Hydro project 521, Idaho County
Hydro Β· Shingle Creek, LLC
0.2 MWOperating Idaho, IDWest May 2017target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)