Completed queue projects in Idaho (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown785.5 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn21339 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Smith Creek
Hydro
39.0 MWOperating Boundary, IDWest Jul 2015target 1987
Solar project 503, Twin Falls County
Solar Β· Jackpot Holdings, LLC
20.0 MWOperating Twin Falls, IDWest Aug 20152022
Solar project 502, Twin Falls County
Solar Β· Jackpot Holdings, LLC
20.0 MWOperating Twin Falls, IDWest Aug 20152022
Other project 501, Cassia County
Other Β· CAFCo Idaho Refuse Management LLC
5.0 MWOperating Cassia, IDWest Jul 2015target 2018
Hydro project 494, Lincoln County
Hydro
1.2 MWOperating Lincoln, IDWest May 2015target 2016
Hydro project 469, Jerome County
Hydro
0.2 MWOperating Jerome, IDWest Mar 2015target 2015
Hydro project 468, Jerome County
Hydro
0.1 MWOperating Jerome, IDWest Mar 2015target 2015

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)