Completed queue projects in Idaho (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown523.1 MW
Active in queue300 MW1 requests
Agreement signed0.0 MW0 requests
Withdrawn550.0 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 411, Elmore County
Solar
10.0 MWOperating Elmore, IDWest Sep 2013target 2016
Solar project 418, Elmore County
Solar
10.0 MWOperating Elmore, IDWest Oct 2013target 2016
Hydro project 410, Gooding County
Hydro
1.3 MWOperating Gooding, IDWest Jul 2013target 2016
Hydro project 409, Jerome County
Hydro
1.3 MWOperating Jerome, IDWest Jul 2013target 2016
Hydro project 406, Lemhi County
Hydro
0.5 MWOperating Lemhi, IDWest Feb 2013target 2014

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)