πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Georgia

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Georgia (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5550 MW
Active in queue758 MW6 requests
Agreement signed758 MW6 requests
Withdrawn344,366 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Decatur Solar
Solar
200 MWOperating Decatur, GASoutheast Aug 20182024
Washington County Solar
Solar
150 MWOperating Washington, GASoutheast Aug 20182024
Blackwater Solar
Solar
80.0 MWOperating Ware, GASoutheast Oct 20182024
Bull Dog Solar
Solar
80.0 MWOperating Warren, GASoutheast Dec 20182024
Sonny Solar
Solar
40.0 MWOperating Elbert, GASoutheast Oct 20182024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)