United States β€Ί Grid β€Ί Interconnection queues β€Ί Delaware

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Delaware (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9219 MW
Active in queue74.3 MW4 requests
Agreement signed0.0 MW0 requests
Withdrawn9219 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project AB2-130, Sussex County
Solar
85.0 MWWithdrawn / abandoned Sussex, DEPJM Apr 2016target 2019
Solar project AB2-187, Sussex County
Solar
80.0 MWWithdrawn / abandoned Sussex, DEPJM Apr 2016target 2017
Solar project AC2-006, Sussex County
Solar
10.0 MWWithdrawn / abandoned Sussex, DEPJM Nov 2016target 2018
Solar project AC1-229, Sussex County
Solar
10.0 MWWithdrawn / abandoned Sussex, DEPJM Oct 2016target 2018
Solar project AC1-095, New Castle County
Solar
9.9 MWWithdrawn / abandoned New Castle, DEPJM Oct 2016target 2018
Other project AC2-011, Sussex County
Other
6.0 MWWithdrawn / abandoned Sussex, DEPJM Dec 2016target 2018
Other project AC2-010, Sussex County
Other
6.0 MWWithdrawn / abandoned Sussex, DEPJM Dec 2016target 2018
Other project AC1-178, Sussex County
Other
6.0 MWWithdrawn / abandoned Sussex, DEPJM Oct 2016target 2019
Other project AC1-179, Sussex County
Other
6.0 MWWithdrawn / abandoned Sussex, DEPJM Oct 2016target 2019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)