United States β€Ί Grid β€Ί Interconnection queues β€Ί Delaware

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Delaware (2010 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4645 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn4645 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project W3-172, New Castle County
Gas
402 MWWithdrawn / abandoned New Castle, DEPJM Oct 2010target 2013
Gas project W3-173, New Castle County
Gas
218 MWWithdrawn / abandoned New Castle, DEPJM Oct 2010target 2015
Solar project W3-087, Kent County
Solar
15.0 MWWithdrawn / abandoned Kent, DEPJM Oct 2010target 2011
Solar project W3-086, New Castle County
Solar
10.0 MWWithdrawn / abandoned New Castle, DEPJM Oct 2010target 2011

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)