United States β€Ί Grid β€Ί Interconnection queues β€Ί Colorado

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Colorado (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5108 MW
Active in queue1,087 MW3 requests
Agreement signed1,087 MW3 requests
Withdrawn5108 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project GI-2011-3, Alamosa County
Solar
60.0 MWWithdrawn / abandoned Alamosa, COWest Mar 2011target 2014
Solar project GI-2011-6, Boulder County
Solar
20.0 MWWithdrawn / abandoned Boulder, COWest Jul 2011target 2012
Solar project GI-2011-8, Pueblo County
Solar
20.0 MWWithdrawn / abandoned Pueblo, COWest Nov 2011target 2012
Gas project GI-2011-1, Arapahoe County
Gas
6.3 MWWithdrawn / abandoned Arapahoe, COWest Feb 2011target 2012
Solar project GI-2011-5, Boulder County
Solar
2.0 MWWithdrawn / abandoned Boulder, COWest Jul 2011target 2012

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)