United States β€Ί Grid β€Ί Interconnection queues β€Ί Arkansas

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Arkansas (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown121,998 MW
Active in queue1,065 MW5 requests
Agreement signed80.0 MW1 requests
Withdrawn121,998 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

12 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J1097, Lonoke County
Solar
500 MWWithdrawn / abandoned Lonoke, ARMISO Mar 2018target 2021
Solar project J1078, Mississippi County
Solar
300 MWWithdrawn / abandoned Mississippi, ARMISO Mar 2018target 2021
Solar project J1093, Desha County
Solar
200 MWWithdrawn / abandoned Desha, ARMISO Mar 2018target 2021
Solar project J1091, Craighead County
Solar
150 MWWithdrawn / abandoned Craighead, ARMISO Mar 2018target 2021
Solar project J1156, Crittenden County
Solar
150 MWWithdrawn / abandoned Crittenden, ARMISO Mar 2018target 2020
Solar project J972, St. Francis County
Solar
140 MWWithdrawn / abandoned St. Francis, ARMISO Mar 2018target 2021
Solar project GEN-2018-023, Little River County
Solar
126 MWWithdrawn / abandoned Little River, ARSPP Apr 2018target 2021
Solar project J1147, St. Francis County
Solar
100 MWWithdrawn / abandoned St. Francis, ARMISO Mar 2018target 2021
Solar project J1134, White County
Solar
100 MWWithdrawn / abandoned White, ARMISO Mar 2018target 2021
Solar project J1137, Jackson County
Solar
100 MWWithdrawn / abandoned Jackson, ARMISO Mar 2018target 2021
Solar project J1023, Mississippi County
Solar
82.0 MWWithdrawn / abandoned Mississippi, ARMISO Mar 2018target 2021
Solar project J1167, St. Francis County
Solar
50.0 MWWithdrawn / abandoned St. Francis, ARMISO Mar 2018target 2020

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)