United States β€Ί Grid β€Ί Interconnection queues β€Ί Alabama

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Alabama (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown31,506 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn31,506 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project IC-252, Lee County
Gas
968 MWWithdrawn / abandoned Lee, ALSoutheast Feb 2011
Gas project IC-251, Lee County
Gas
520 MWWithdrawn / abandoned Lee, ALSoutheast Feb 2011
Hydro project IC-257, Monroe County
Hydro
18.0 MWWithdrawn / abandoned Monroe, ALSoutheast Aug 2011

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)