United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in West (non-ISO utilities) (2025 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4405 MW
Active in queue84.1 GW325 requests
Agreement signed0.1 MW1 requests
Withdrawn7520.5 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Hydro project 757, Baker County
Hydro Β· Idaho Power Company - Power Supply
220 MWOperating Baker, ORWest Mar 2025
Hydro project 795, Power County
Hydro Β· Idaho Power Company - Power Supply
118 MWOperating Power, IDWest Jul 2025
Other project 753, Twin Falls County
Other Β· Idaho Power Company-Power Supply
59.0 MWOperating Twin Falls, IDWest Jan 2025
Hydro project 794, Jerome County
Hydro Β· North Side Energy Company, Inc.
7.7 MWOperating Jerome, IDWest Apr 2025target 2011

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)