πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Southeast (non-ISO utilities) (2014 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown51,607 MW
Active in queue1,607 MW5 requests
Agreement signed1,607 MW5 requests
Withdrawn766,064 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project 257, Shelby County
Gas
1,132 MWAgreement signed Shelby, TNSoutheast Aug 2014target 2018
Nuclear project 255, Limestone County
Nuclear
155 MWAgreement signed Limestone, ALSoutheast Aug 2014target 2018
Nuclear project 256, Limestone County
Nuclear
155 MWAgreement signed Limestone, ALSoutheast Aug 2014target 2019
Nuclear project 254, Limestone County
Nuclear
155 MWAgreement signed Limestone, ALSoutheast Aug 2014target 2018
Solar project LGE-GIS-2014-001, Mercer County
Solar
10.0 MWAgreement signed Mercer, KYSoutheast Aug 2014target 2016

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)