United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Southeast (non-ISO utilities) (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown227.0 MW
Active in queue27.0 MW2 requests
Agreement signed27.0 MW2 requests
Withdrawn3214.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Hydro project LGE-GIS-2011-003, Jefferson County
Hydro
21.0 MWAgreement signed Jefferson, KYSoutheast Feb 2011target 2013
Hydro project LGE-GIS-2011-005, Mercer County
Hydro
6.0 MWAgreement signed Mercer, KYSoutheast Nov 2011target 2013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)