Completed queue projects in Southeast (non-ISO utilities) (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown73,676 MW
Active in queue691 MW1 requests
Agreement signed691 MW1 requests
Withdrawn624,349 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project 243, Muhlenberg County
Gas
1,184 MWOperating Muhlenberg, KYSoutheast Nov 2013
Gas project 123, Citrus County
Gas Β· Duke Energy Florida, LLC
940 MWOperating Citrus, FLSoutheast Sep 20132018
Gas project 124, Citrus County
Gas Β· Duke Energy Florida, LLC
940 MWOperating Citrus, FLSoutheast Sep 20132018
Gas project 17114
Gas Β· NTE Carolinas, LLC
500 MWOperating Southeast Dec 20132018
Solar project 4894, Wilson County
Solar Β· Duke Energy Progress, LLC
40.0 MWOperating Wilson, NCSoutheast Sep 20132016
Gas project 17112
Gas Β· Duke Energy Carolinas-0001674400
36.0 MWOperating Southeast Jun 20132015
Gas project 17113
Gas Β· Duke Energy Carolinas LLC
36.0 MWOperating Southeast Jun 20132014

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)