United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Projects with signed interconnection agreements in Southeast (non-ISO utilities) (2025 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown392.8 MW
Active in queue42.0 GW264 requests
Agreement signed92.8 MW3 requests
Withdrawn448,611 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project PP00013, Richmond County
Gas
46.8 MWAgreement signed Richmond, NCSoutheast Apr 2025target 2025
Gas project PP00012, Wayne County
Gas
26.0 MWAgreement signed Wayne, NCSoutheast Apr 2025target 2025
Gas project PP00011, Wayne County
Gas
20.0 MWAgreement signed Wayne, NCSoutheast Apr 2025target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)