United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Arkansas, Southeast
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project 597, Mississippi County Solar |
500 MW | Withdrawn / abandoned |
| Solar + storage project 592, Mississippi County Solar + storage |
500 MW | Withdrawn / abandoned |
| Solar + storage project 594, Mississippi County Solar + storage |
500 MW | Withdrawn / abandoned |
| Solar + storage project 593, Mississippi County Solar + storage |
500 MW | Withdrawn / abandoned |
| Solar project 599, Mississippi County Solar |
500 MW | Withdrawn / abandoned |
| Solar project 598, Mississippi County Solar |
500 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)279 Β· 47.5 GW
- SPP (Southwest Power Pool)39 Β· 7,303 MW
- Southeast (non-ISO utilities)6 Β· 3,000 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)