OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Missouri, SPP (2024 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery storage project GEN-2024-074, Jackson County Battery storage |
200 MW | In study |
| Solar project GEN-2024-055, Vernon County Solar |
175 MW | In study |
| Battery storage project GEN-2024-084, Lawrence County Battery storage |
167 MW | In study |
| Gas project GEN-2024-088, Greene County Gas |
145 MW | In study |
| Solar project GEN-2024-054, Cooper County Solar |
120 MW | In study |
| Battery storage project GEN-2024-091, Jasper County Battery storage |
100 MW | In study |
| Battery storage project GEN-2024-090, Clay County Battery storage |
100 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)10 Β· 2,579 MW
- Southeast (non-ISO utilities)3 Β· 1,205 MW
- SPP (Southwest Power Pool)7 Β· 1,007 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)