OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in PJM (Mid-Atlantic, Midwest) (2024 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
Nothing matches these filters.
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)411 Β· 78.5 GW
- NYISO (New York)294 Β· 63.3 GW
- West (non-ISO utilities)237 Β· 46.1 GW
- Southeast (non-ISO utilities)195 Β· 32.8 GW
- ISO-NE (New England)97 Β· 13.2 GW
- ERCOT (Texas)50 Β· 10.0 GW
- SPP (Southwest Power Pool)29 Β· 7,503 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)