United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESProjects with signed interconnection agreements in PJM (Mid-Atlantic, Midwest) (2021 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
Nothing matches these filters.
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)68 Β· 35.4 GW
- ERCOT (Texas)91 Β· 16.3 GW
- West (non-ISO utilities)55 Β· 11.7 GW
- ISO-NE (New England)17 Β· 3,473 MW
- SPP (Southwest Power Pool)19 Β· 3,459 MW
- Southeast (non-ISO utilities)12 Β· 1,908 MW
- MISO (Midcontinent)8 Β· 1,055 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)