United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in NYISO (New York) (2010 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown51,285 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn51,285 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Lake Erie Wind
Onshore wind Β· Lake Erie Wind, LLC
810 MWWithdrawn / abandoned Chautauqua, NYNYISO Feb 2010
Hounsfield Wind
Onshore wind Β· Pattern Renewables
249 MWWithdrawn / abandoned Jefferson, NYNYISO Sep 2010
Watkins Glen Wind
Onshore wind Β· NextEra Energy Resources, LLC
122 MWWithdrawn / abandoned Schuyler, NYNYISO Dec 2010
North Ridge Wind
Onshore wind Β· Atlantic Wind, LLC
100 MWWithdrawn / abandoned St. Lawrence, NYNYISO May 2010
Oneida-Herkimer Landfill
Other Β· WM Renewable Energy
3.2 MWWithdrawn / abandoned Oneida, NYNYISO Apr 2010

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)