Completed queue projects in NYISO (New York) (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown8545 MW
Active in queue910 MW4 requests
Agreement signed0.0 MW0 requests
Withdrawn334,251 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Bayonne Energy Center II
Gas Β· Bayonne Energy Center
129 MWOperating NYNYISO Aug 2015
Bayonne Energy Center II
Gas Β· Bayonne Energy Center
129 MWOperating Hudson, NJNYISO Aug 20152019
Ball Hill Wind
Onshore wind Β· Ball Hill Wind Energy, LLC
103 MWOperating NYNYISO Jun 20152023
Ball Hill Wind
Onshore wind Β· Ball Hill Wind Energy, LLC
103 MWOperating Chautauqua, NYNYISO Jun 2015
Orangeville
Battery storage Β· Orangeville Energy Storage LLC
20.0 MWOperating Wyoming, NYNYISO Sep 20152021
Riverhead Solar
Solar Β· Riverhead Solar Farm LLC
20.0 MWOperating NYNYISO Feb 2015
Orangeville
Battery storage Β· Orangeville Energy Storage LLC
20.0 MWOperating NYNYISO Sep 2015
Riverhead Solar
Solar Β· Riverhead Solar Farm LLC
20.0 MWOperating Suffolk, NYNYISO Feb 20152019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)