OCTARY USA Β· INTERCONNECTION QUEUESProjects with signed interconnection agreements in MISO (Midcontinent) (2022 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project J1513, Waupaca County Solar |
300 MW | Agreement signed |
| Solar project J1576, Washington Parish County Solar |
200 MW | Agreement signed |
| Solar project J1751, Wood County Solar |
151 MW | Agreement signed |
| Surplus; Polaris Solar Other |
100 MW | Agreement signed |
| Surplus; Pine River Solar Other |
80.0 MW | Agreement signed |
| Surplus; J1369 Other |
50.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)113 Β· 23.2 GW
- West (non-ISO utilities)66 Β· 12.2 GW
- Southeast (non-ISO utilities)33 Β· 5,225 MW
- MISO (Midcontinent)6 Β· 881 MW
- SPP (Southwest Power Pool)4 Β· 790 MW
- ISO-NE (New England)6 Β· 706 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)