πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Montana, MISO

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4382 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn4382 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project G753, Fallon County
Onshore wind
300 MWWithdrawn / abandoned Fallon, MTMISO Feb 2007target 2010
Gas project G891, Fallon County
Gas
42.0 MWWithdrawn / abandoned Fallon, MTMISO Oct 2007target 2008
Solar + storage project J1766, Fallon County
Solar + storage
20.0 MWWithdrawn / abandoned Fallon, MTMISO Jun 2020target 2023
Onshore wind project G994, Wibaux County
Onshore wind
19.5 MWWithdrawn / abandoned Wibaux, MTMISO Mar 2008target 2008

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)