United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESQueue requests in study in ISO-NE (New England) (2021 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Offshore Wind Inc. (Q806) Offshore wind |
487 MW | In study |
| Solar Solar |
20.0 MW | In study |
| Offshore wind Inc (QP700) Offshore wind |
18.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)172 Β· 56.8 GW
- CAISO (California)70 Β· 31.5 GW
- ERCOT (Texas)116 Β· 23.2 GW
- MISO (Midcontinent)126 Β· 22.4 GW
- Southeast (non-ISO utilities)44 Β· 9,966 MW
- SPP (Southwest Power Pool)25 Β· 5,570 MW
- PJM (Mid-Atlantic, Midwest)49 Β· 2,072 MW
- NYISO (New York)11 Β· 991 MW
- ISO-NE (New England)3 Β· 525 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)