Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Bridgeport Energy PSS Tuning Gas |
588 MW | |
| Simple Cycle Gas Turbine Gas |
61.9 MW | |
| Quinebaug Solar Solar |
49.0 MW | |
| Cogen DG Gas |
43.0 MW | |
| Moore Station Uprate Hydro |
4.6 MW | |
| Hemphill Increase Other |
3.4 MW | |
| Huntington Falls 2017 Upgrades Hydro |
1.6 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)108 Β· 9,751 MW
- SPP (Southwest Power Pool)43 Β· 7,836 MW
- ERCOT (Texas)19 Β· 3,681 MW
- CAISO (California)17 Β· 3,611 MW
- Southeast (non-ISO utilities)33 Β· 3,604 MW
- MISO (Midcontinent)28 Β· 3,509 MW
- West (non-ISO utilities)48 Β· 3,184 MW
- ISO-NE (New England)7 Β· 752 MW
- NYISO (New York)10 Β· 633 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)