United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in CAISO (California) (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3131 MW
Active in queue131 MW3 requests
Agreement signed131 MW3 requests
Withdrawn477,426 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Sunshine Valley Solar 1
Solar + storage
90.0 MWAgreement signed Nye, NVCAISO Apr 2013target 2026
Rio Bravo Solar 2
Solar + storage
40.0 MWAgreement signed Kern, CACAISO Apr 20132016
Lassen Lodge Hydroelectric 2
Hydro
0.5 MWAgreement signed Tehama, CACAISO Apr 2013target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)