United States › Grid › Interconnection queues › New Mexico
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in New Mexico — page 9
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Abeyta Project Solar · enXco Dev. Corp |
1.5 MW | Withdrawn / abandoned |
| Gallinas Project Solar · enXco Dev. Corp. |
1.5 MW | Withdrawn / abandoned |
| Solar project SGI-PNM-2008-07, San Miguel County Solar |
1.0 MW | Withdrawn / abandoned |
| Solar project SGI-PNM-2021-42, Luna County Solar |
1.0 MW | Withdrawn / abandoned |
| Solar project SGI-PNM-2021-36, Luna County Solar |
1.0 MW | Withdrawn / abandoned |
| Solar project SGI-PNM-2015-05, Grant County Solar |
0.5 MW | Withdrawn / abandoned |
| Solar project SGI-PNM-2015-06, Grant County Solar |
0.4 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- SPP (Southwest Power Pool)145 · 29.1 GW
- West (non-ISO utilities)261 · 27.8 GW
- CAISO (California)1 · 1,700 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)